Project overview
FK integrated exterior wall panels can give a steel-frame office building a clean, contemporary envelope while combining thermal and decorative functions.
The challenge
The facade must balance a professional appearance, fast enclosure, thermal continuity and repeatable installation across a regular structural grid.
Our solution
Large-format FK panels are coordinated with window modules and installed as prefabricated facade units, reducing wet trades and simplifying interface control.
Project highlights
- Integrated insulation and finish
- Large-format panel rhythm
- Fast dry installation
- Replaceable facade units



Project Consultation & Solution Design
We fully understand your project requirements, including building purpose, dimension, load‑bearing demands, local wind‑snow‑seismic codes and budget. Our structural engineers customize feasible steel‑structure solutions and preliminary drawings for your review.
- 1、Confirm project parameters & local building standards
- 2、Technical communication and requirement sorting
- 3、Custom‑tailored structural scheme & preliminary drawing output
Detailed Drawing & Production Planning
After scheme confirmation, our engineering team completes detailed construction drawings. We arrange raw material procurement, formulate production schedule and quality inspection standards before manufacturing starts.
- 1、Deepen construction drawings for fabrication
- 2、Raw‑material selection and procurement arrangement
- 3、Formulate production plan & quality control specifications
Factory Fabrication & Quality Inspection
All steel components are manufactured in our modern workshop. Strict dimension checking, welding inspection, anti‑corrosion blasting and painting work are completed in‑house. Qualified products are packed for overseas shipment.
- 1、Steel component cutting, welding and forming
- 2、Multi‑round quality testing & non‑destructive inspection
- 3、Anti‑corrosion treatment, packaging and loading for delivery
On‑site Guidance & Project Completion
We supply detailed installation manuals. Professional engineers provide remote installation guidance. After erection, we conduct final acceptance check to guarantee the whole steel building meets design requirements.
- 1、Provide installation documents & technical guidance
- 2、Track site erection progress
- 3、Final acceptance & project hand‑over










